
![]() |
|
![]() |
Click on any thumbnail to see the full size pic
![]() |
The center column awaits raising into place as the support for one of the four tent buildings |
| With the steel center column in place and the exterior steel framing in place over the concrete foundation, it's time to add the canvas roof |
![]() |
![]() |
The canvas is secured to the center column |
| Workers prepare to stretch the canvas out to the steel framework of the red tent |
![]() |
![]() |
Now it's time for the blue tent canvas to be pulled into place. In the foreground the metal cap which will sit atop one of the tents, and the steel framework for one of the Yum Yum Palace sundaes awaits placement |
| Workers pull the edges of the tent roof into place |
![]() |
![]() |
View of the tent roofs in place from the top of the Miniature Marvels mountain range |
| The windows are in place on the four tents, though paving Dream Street has not yet begun. Construction of the Carousel does not seem to have started yet. |
![]() |
|
As opening day approaches, Dream Street has been paved, and the canvas arches have been placed around the windows of the tent buildings. The four tents served as the parks main gift shops while the front gate was still located at the end of Dream Street. |
| Go to the Construction Overview | Go to pictures of the Four Tents as they stand today |